CURRENT PROJECTS
No.Project TitleClient/Developer
1Improvement to Opera Estate Outlet Drain (Siglap Link to Sea) with ABC Waters EnhancementsPUB
2Proposed Twin 1800MM Diameter Water Pipelines From Bishan Road To Woodleigh ParkPUB
3Proposed Twin 1800mm Diameter Water Pipelines from Island Club Road to Upper Thomson RoadPUB
4Proposed 2200mm Diameter Raw Water pipeline along Kallang River from Bishan road to Braddell RoadPUB
COMPLETED PROJECTS
No.Project TitleClient/Developer
1Proposed Sewers in Stevens Road and Merpati Road AreasPUB
2Diversion of Trunk Sewer at Towner RoadHDB
3Improvement to Bayshore Park Outlet Drain (ECP Service Road to the Sea)PUB
4Improvement to Opera Estate Outlet Drain (Between Marine Parade Rd and Siglap Link)PUB
5Sewerage Scheme to serve Pulau Punggol Barat Contract 2 - Proposed Pumping Mains along Seletar North LinkPUB
6Design and Laying of CLS pipe, GRP and HDPE Pipes by open cut & pipe jacking method for Proposed Desalination Plant at Marina EastPUB/ Keppel
7Proposed 2200mm diameter Pipeline from Tanglin Halt Road to AYE/Henderson RoadPUB
8ABC Waters Project at Chestnut Drive Outlet drain (Petir Road to Dairy Farm Crescent)PUB
9Proposed Diversion of Outlet Drain at Bishan Street 11HDB
10Proposed Sewers in Geylang, Jalan Wangi, Woodlands Industrial Park E1 and Collyer Quey AreasPUB
11Covering of Open Drains with Mesh Gratings at Heavy Leaf Shedding AreasPUB
12Improvement to Changi Airport Diversion Drain - Outlet Drain 2 (between Changi Coast Road and Changi Airport Drain)PUB
13Improvement to Farnborough / Telok Paku Road Outlet DrainPUB
14Improvement to Roadside Drains IV Contrat 3A-6 (Lorong 1 to 7 Realty Park, Lorong N Telok Kurau, St. Patrick's Road and Lorong Ah Soo Areas)PUB
15Improvement to Tanglin Halt Outlet Drain - Contract 3PUB
16Construction of Driving Circuit and Annex Building at Kranji (Project D2009-00100-020)DSTA
17Construction of Yishun Street 51(Balance ) and Yishun Street 52HDB
18Construction of Trunk Sewer along Yishun Avenue 6, Yishun Ring Road, Yishun Avenue 1, Yishun Street 51 and Yishun Street 41HDB
19Design, Build, Operate and Maintain Temporary Bridges and Tidal Gate at Sungei Pandan KechilPUB
20ABC Waters Project at Sungei Api-Api and Sungei TampinesPUB
21Construction of 22m wide Open Outlet Drain at Meranti Lane, Jurong Island (Contract No. JTC C07102012)JTC
22Improvement to Bukit Timah Canal Near Maple AvenuePUB
23Contract 1691B Sewer Diversion Works at Tuas (Package B)LTA
24Contract 1691A Sewer Diversion Works at Tuas (Package A)LTA
25Sewer Extension to phase out Sewage Treatment Plants Phase II-Package APUB
26Widening of Boon Lay Way from Corporation Road to Jalan Boon Lay (Contract ER338)LTA
27Proposed Sewers at Punggol Road Areas-Contract 1PUB
28Improvement to Bayshore Road Outlet DrainPUB
29Temporary Road Widening Works at Kaki Bukit Estate For Downtown Line 3 (Contract 9083)LTA
30Proposed Slope Rectification Works at lot 3215V & 2992P MK10 at Bukit Batok Transmission Centre at 21 Lorong Sesuai Singapore 596305MediaCorp Pte Ltd
31Improvement to Outlet Drain at Lorong L Telok KurauPUB
32ABC Waters Development along Alexandra Canal Phase 1 (from Tanglin Road to Delta Road)PUB
33Part 1:-Construction Works for ABC Waters Development along Alexandra Canal Phase 1 (from Tanglin Road to Delta Road)
34Construction of Trunk Sewer in Bukit Panjang Town Neighbourhood 6(Part 1)HDB
35Sewers Extension in Pasir Ris farmway Areas-Contract 1PUB
36Improvement to Roadside Drains III Western Sector Contract 1-Boon Lay and Corporation Road AreaPUB
37Contract 9156A-Sewer Diversion Works (Section 1)LTA
38Proposed Roads, Drains, Sewers and Landscaping works at one-north Development ( Phase 1E)JTC
39Improvement to Roadside Drains III Eastern Sector Contract 2-Bedok North RoadPUB
40Sewer Repair at Various Pumping Station Catchments-Contract 9PUB
41Improvement to Alexandra Canal Phase 1-Contract 6 (From Zion Road to Kim Seng Road)PUB
42Proposed Concrete Pavement, Sewer Pump Sump & Ancillary Works for Container Stacking Yard next to Blk X12/TT Service Bay, Brani TerminalPSA
43Proposed Common Services Tunnels Phase 1B & 2(Stage 2) at Marina South - Installation and Removal of Strut and waler for temporary shoringURA
44Proposed Pedestrian Bridge across Henderson Road on lts 3074P, 3073V, 3071M, 3088P & 2044M MK at Mount Faber Loop Henderson Road and Telok Blangah HillURA
45Proposed Common Services Tunnels Phase 1B & 2(Stage 2) at Marina South - Driving of Soldier Piles & King Post for temporary shoringURA
46Construction of Roads, Drains, Sewers and Landscaping works at one-north Development, Phase 1CJTC
47Term Contract 3- Contruction of Pedestrian Overhead Bridges (Contract ER115)LTA
48Seletar Sewerage Scheme Phase II-Contract 8 (Proposed Sewers in Yio Chu Kang and Jalan Kayu Areas)PUB
49Proposed Sewerage Works in Marina South-Stage 1(Nominated Sub-Contract)URA
50Urgent Slope Stabilisation Behind Lily AvenuePUB
51Conversion of RMG Yard to Hyster and Road Improvement works at Street, Brani TerminalPSA
52Contract RD122-Upgrading of Vehicular Bridges at 10 LocationsLTA
53Deep Tunnel Sewerage System - Ridout / Holland Link SewersPUB
54Improvement to Old Roadside Drains in Fengshan Estate and Teacher's Housing EstatePUB
55Construction of Block Pavement to Concrete Rigid Pavement at Street 10, Brani TerminalPSA
56Construction of Fence at Changi Navel Base ( Project LE(S) 0269 C65)DSTA
57Realignment and Reconstruction of Existing R.C. Box Drain (Phase 2) with Minor Sewer Works at one-north Development, North Buona VistaJTC
58Term Contract for Reconstruction of Sunken Floor Slab at Eunos Industrial Estate for a period of 6 MonthsHDB
59Drainage works in Jurong, Kranji, Pandan, Woodlands, Bukit Timah and Singapore River/Stamford Marina Catchments for the period 1 Apr 2003 to 31 Mar 2006PUB
60The Transportation and Disposal of Sludge from Water Treatment Plants to Changi Reclaimed LandPUB
61Earthworks at North Buona VistaJTC
62Demolition and Re-Construction of Monsoon Drains for Proposed Condominium at Lorong ChuanPeak Residence Development Pte Ltd
63Road Repair and Resurfacing Works at Sembawang (Phase 1)HDB
64Upgrading of Airside Cargo Drain at Singapore Changi AirportCAAS
65Improvement Works to Bedok Water Reclamation PlantPUB
66Jurong Wastewater Treatment works Phase III-Extension Contract 3 on lot 563 MK7 at Pioneer roadPUB
67Construction of Sembawang Way, Construction of Bridge Over Sungei Sembawang at Sembawang WayHDB
68Proposed Erection of One-storey Detached House on lot 2278 pt & 2373 MK19 at 51C Kampang Wak HassanDr Tan Hwa Luck
69Construction of Minor sewer for Oled Plant at Tampines Industrial Avenue 2 & 3JTC
70Proposed Final Premix Surfacing and Ancillary Works to Roads at Pasir Ris Drive 1JTC
71Improvement to Outlet Drain Behind Kim Seng Shopping Centre and at Jalan BesarPUB
72Minor Sewers at Gaylang Serai Redevelopment Contract 26HDB
73Proposed Sports Complex at Jurong West Street 93/Pioneer North Road - Earthworks and Piled FoundationsSingapore Sports Council
74Piling, Demolision and Drain Diversion works for Proposed Safra Club at Telok Blangah Way / Henderson RoadSAFRA National Service Association
75Design, Construction and Completion of Site Office Accomodation at Paya LebarLTA
76Phasing Out of STPs at Lorine Road/Adam Drive in Marina Basin CatchmentPUB (Sewerage Dept)
77Conversion of Block Pavement Road to Concrete road for thoroughfare behind berth B08 at Brani TerminalPSA
78Demolition, Piling, Services Diversion, Temporary Works, Driveway and Carpark for Elias Park Primary School on lot 38-1PT, 34-1PT & 34-1PT MK29 at 11 Pasir Ris Streel 52Ministry of Education
79Punggol Town Sewerage Scheme-Contract III Laying of Trunk Sewer along TPE from Punggol Road to Sengkang East RoadPUB (Sewerage Dept)